MSc
6(5) A minimum of one square metre per student for every class or batch.
It should be less than this
A minimum of one square metre per student must be available in each class or batch. No centre may operate in any basement area. Appropriate parking must be provided for students and staff. The building must comply with fire and building safety codes and hold a current Fire and Building Safety Certificate. Existing centres get six months to upgrade.
The safety requirements are not in dispute. The space and parking norms are where cost bites hardest — in dense parts of Mumbai, Pune and Thane, one sq. metre per student and dedicated parking are very expensive and in many buildings physically impossible.
You can respond to any one of these lines on its own — pick it in the response form below.
Verify your email address to vote and respond.
Verify emailMSc
6(5) A minimum of one square metre per student for every class or batch.